Hey guys,
on my usage report I can see the usage of CPU, based on a one day period. I'm a little bit confused.
VM X has a consumption of 8.26. What does the 8.26 stand for?
1. An average value of one day?
2. The sum of consumed CPU of one day?
3. What is the basis for calculation? The clock rate of a CPU summarized over one day?
I would like to be able to justify my report.
regards
danmoe